Network capacities Room Eggenfelden

Open data API in a single place

Provided by Bundesamt für Kartographie und Geodäsie

Get early access to Network capacities Room Eggenfelden API!

Let us know and we will figure it out for you.

Dataset information

Catalog
Country of origin
Updated
2022.01.01 00:00
Created
Available languages
German
Keywords
Stromnetz, simply, Leistung, Erzeugung, Bayernwerk, gdiby, Netzkapazität, Einspeise, connect, Leitung, Mittelspannung
Quality scoring
155

Dataset description

The existing medium voltage grid topology is mapped schematically and not to scale on a background map. Shown in green colour are the lines or nodes in the medium voltage grid, to which an input power of up to 750 kW according to the 2-% voltage stroke criterion according to VDE-AR-N 4110 could be included. On lines and knots colored orange, the capacity is limited. The map’s plan/data status can be extracted from the legend. Ongoing or commissioned construction measures are not shown in the map. Connection requests received after the plan/data status of feed-in users are not taken into account. The graphical representation is based on the calculation of the maximum permissible voltage stroke (2 % criterion) according to VDE-AR-N 4110. The possible network linking points are only considered as information for medium-voltage feeders and not as binding feed-in pre-remarks. Further technical connection criteria and parameters will only be checked during the mandatory network impact assessment. This can lead to an assignment from a more distant network link point. In particular, the following parameters are untested: Short-circuit strength, Separation point optimisation, Earth leakage current compensation, Load on the HS/MS mains transformers; Electricity bottlenecks in the medium voltage grid, Compliance with absolute voltage limits, Compliance with the permissible network retroactivity/shaft limits; Compliance with conductor rope ground spacing of medium-voltage overhead lines; Technical connection on site, Application of peak capping methods (e.g. from the FNN method “flat-rate peak capping with uniform reduction factors”), individual rights of use of individual customers for medium-voltage lines, temporarily operated with 20 kV 110 kV overhead line systems, Bottlenecks in upstream grids
Build on reliable and scalable technology
Revolgy LogoAmazon Web Services LogoGoogle Cloud Logo
FAQ

Frequently Asked Questions

Some basic informations about API Store ®.

Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.

Didn't find the API you need?

Let us know and we will figure it out for you.

API Store provides access to European Open Data via scalable and reliable REST API interface.
Copyright © 2024. Made with ♥ by Apitalks