The network structure data provide an overview of the structure of the distribution network. In addition to the technical data such as circuit lengths, installed power, number of withdrawal points and average losses per network and substation level, energy economic data such as the quantity and average procurement price of the grid loss energy, the annual work taken per network and substation level, the maximum annual load including the time of its occurrence, the maximum withdrawal load and the upstream transmission network of 50Hertz Transmission GmbH as well as the monthly feed-in volumes to the grid levels are presented.
Data from 2006 onwards
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.